SOIC-16
TSS721ADR
TSS721A is a single chip transceiver developed for Meter-Bus standard (EN1434-3) applications. The TSS721A interface circuit adjusts the different potentials between a slave system and the Meter- Bus master. The connection to the bus is polarity independent and supports full galvanic slave isolation with optocouplers. The circuit is supplied by the master via the bus. Therefore, this circuit offers no additional load for the slave battery. A power-fail function is integrated. The receiver has dynamic level recognition, and the transmitter has a programmable current sink. A 3.3-V voltage regulator, with power reserve for a delayed switch off at bus fault, is
Brand
TI
Package
SOIC-16
Lead Time
In stock
Date Code
Within 2 years
TSS721ADR Parameters
| Package | SOIC-16 |
|---|---|
| Brand | TI |
| Date Code | Within 2 years |
| Interface type | UART |
| Operating Temperature | -25℃~+85℃ |
| Features | Specifications are available on request. |
| Category | OtherInterface |
|---|---|
| Stock | 1,141 |
| MOQ / SPQ | 1 / 1 |
| Operating voltage | 3.3V |
| Operating current | 650uA |
TSS721ADR Overview
TSS721A is a single chip transceiver developed for Meter-Bus standard (EN1434-3) applications. The TSS721A interface circuit adjusts the different potentials between a slave system and the Meter- Bus master. The connection to the bus is polarity independent and supports full galvanic slave isolation with optocouplers. The circuit is supplied by the master via the bus. Therefore, this circuit offers no additional load for the slave battery. A power-fail function is integrated. The receiver has dynamic level recognition, and the transmitter has a programmable current sink. A 3.3-V voltage regulator, with power reserve for a delayed switch off at bus fault, is
TSS721ADR Procurement Checklist
For a TSS721ADR quotation, provide the full manufacturer part number, required quantity, acceptable date code and delivery destination. Confirm the package (SOIC-16) and electrical requirements against the manufacturer documentation before ordering. Listed stock, prices and lead time require final confirmation.
